Thursday, 17 February 2011

For Sale



















Senator Chairs for sale
'Soul' non stacking chairs
Designed by Pearson Lloyd

design for 21st century retro style – tubular steel cantilever chair with chrome.

£125 each AND free delivery within the Kent area.

These chairs RRP at £293+VAT so this is a great value buy.

For enquiries please call 01622 663232
or email julie@rapinteriors.com

Wednesday, 12 January 2011

Website updates

To stay at the top of the industry, RAP are regularly updating their websites.
Our Homepage www.rapinteriors.com now has some nice CSS3 visual effects, such as box shadows, gradients, and text shadows.
Also built into the homepage is a “latest tweet” box displaying our latest tweet from our twitter profile, and a news box which displays short headlines of posts on this blog.

Other RAP sites are
www.rapofficefurniture.com
A design focused website offering stylish photos of our designer furniture range.

www.rap-ecointeriors.com
The Eco side to RAP, currently under construction. Will offer information and services on all things Eco.

Friday, 10 December 2010

Week One Winner



















RAP are proud to announce the winner week one for the free cut and colour at Lucas Hair Salon,
Debbie Barkbay.

RAP refurbished the salon two years ago, and they have been bursting with success since starting in West Malling in 2008.

Lucas Hair Salon are currently running a special offer for any booking made for colour, cut & blow dry OR high/low lights, cut and blow dry - booked for Jan & Feb 2011 will receive £25.30 worth of hair products by KMS (subject to stock)

Friday, 3 December 2010

Tax changes

New allowances which came into force in April this year have resulted in accelerated tax savings for relocatable partitioning.

Changes from April 2012

From April 2012 the AIA expenditure limit will reduce from £100,000 to £25,000 and writing down allowances will decrease from 20% to 18%.On the same £150,000 expenditure shown in the left chart the tax relief available will change to the chart on the right.


Park and Sail coverage on the BBC

http://www.bbc.co.uk/news/uk-england-kent-11844624

You can also download the interview with BBC Radio Kent
here

New Office!

Shad Thames, London Bridge

This will allow a base for their staff to be more accessible and react even faster to customer requirements as RAP are securing a number of projects for clients in Canary Wharf, Kensington and Knightsbridge. This is yet another success story for RAP Interiors.

The full address is:

Hop Studios

2 Jamaica Road

London

SE1 2BX

Show in Google Maps

Thursday, 2 December 2010

Fire Risk Assessment

RAP are glad to offer a Fire Risk Assessment for your projects. Below are the package options.

Fire Strategy Appraisal

1) Review of client supplied drawings against relevant Building Regulations and British Standards.

2) Written report setting out Fire Strategy against the criteria listed above, including any additional recommendations or identified deficiencies.

Fire Risk Assessment (Bronze)

1) Full non intrusive survey of the building to establish the existing condition and layout of the building including any defects. Where safe access is provided by the client this will include loft spaces, and ceiling voids.

2) Full Fire Risk Report to meet the requirements of the Regulatory Reform (Fire Safety) Order 2005. In addition the risk assessment will address both life safety and property protection issues. The assessment will be carried out in accordance with the appropriate Fire Safety Risk Assessment guide, relevant British Standards and Approved Document B: Fire Safety.

3) Gap analysis will be undertaken against the appropriate fire guidance referred to in 2 above and a schedule of deficiencies produced for record purposes. This will include details of any deficiencies found and note any variations from the record drawings supplied

Fire Risk Assessment (Silver)

As bronze plus

4) Post assessment support will be provided including email and phone support to address the significant findings and recommendations within the Fire Risk Assessment. This will include recommendations for training, and ongoing operation of the building.

5) CAD record drawings to ISO 6790 and photographic records of the survey provided on CD.

Fire Risk assessment (Gold)

As silver package above plus

Hosted online searchable database of all fire risk assessments, recommendations, action plans, and associated maintenance records to provide a complete audit trail and monitoring of your RRO compliance needs.

Construction Stage Inspections

1) Visit site during construction phase to witness either

(a) Installation of fire protection materials, cavity barriers etc that are not visible post completion, or

(b)Undertake witnessing of testing and commissioning of active measures such as fire alarm, emergency lighting, smoke control systems etc